Looking for UHP gas system installation? With an experience of more than 15 years, Zeibaq specialises in designing and installing Ultra High Purity gas systems. We offer our product and services to laboratories, research centres, pharmaceutical units, semiconductor facilities, and advanced manufacturing environments.
Our experts understand that UHP gas installation is more than just connecting cylinders to instruments. We understand that it involves delivering contamination-free gas, ensuring complete safety, and maintaining consistent purity levels according to international quality standards. It requires high precision because even a minor gas leak or a slightly wrong fighting will not only impact the gas purity negatively but also pose a major safety threat. In order to avoid this mistake, our team is trained in precision engineering and ensures that quality is maintained with international standards.
In simple words, UHP gas system is a specially designed pipeline for distribution of following gases:
The above-mentioned gases are very sensitive to contamination and even slight microscopic contamination is unacceptable. This is why these gases are supplied at high purity levels such as 5N (99.999%) or 6N (99.9999%).
Applications Of UHP Systems
System Planning & Engineering Design
A successful UHP installation required detailed system planning. This is why before, the installation process, Zeibaq conducts detailed evaluation of:
Gas Source Setup
The purity of as majorly depends on its source. This is why Zeibaq ensures proper installation of:
Pressure Regulation & gas Panels
Stable pressure is necessary to prevent contamination of gases & instrument damage. Here’s a list of things installed by Zeibaq to ensure stable pressure:
UHP Pipeline Installation
As pipeline installing is one of the most important phases of UHP gas systems, here a list of what Zeibaq uses:
Leak Testing & System Purging
No UHP system is complete without all the necessary testing. Here’s a list of all the tests Zeibaq performs:
Purging ensures removal of:
Point-of-use Installation
In order to maintain safety and ensure quality, Zeibaq at each instrument connection installs the following:
All of this results in stable pressure delivery, controlled gas flow and zero contamination at instrument entry.
Safety Systems Integration
When it comes to UHP gas systems, safety is non-negotiable. In order to ensure this, Zeibaq integrates:
These safety mechanisms ensure compliance with lab safety regulations and industrial gas standards. For hydrogen installations, flameproof fittings and proper ventilation are mandatory.
Why Choose Us For UHP Gas System Installation?
What is 5N and 6N gas purity?
5N means 99.999% purity and on the other hand 6N means 99.9999% purity.
Where does Zeibaq deliver everything?
Zeibaq for more than 15 years has been a trusted UHP gas system across Saudi Arabia.
Can copper pipes be used in UHP gas systems?
No. UHP gas systems need 316L stainless steel tubing. This is because copper can react and get oxidised which will result in contamination.
Why is helium used for testing leaks?
Helium is the best choice for leak testing because its molecules are very small and this helps detecting micro leaks.
Is having a centralised gas room compulsory?
Though it is not mandatory, having a centralised gas room helps improve safety and efficiency.
What should be the frequency for maintenance checks?
It is better to get routine inspection done every 6-12 months.
What kind of industries need UHP gas systems?
Research labs, laboratories, analytical testing facilities, semiconductor manufacturing, etc need UHP gas systems.